Ditch/grip/inlet or outlet/filter drain |
Causing flooding to the highway or third party property |
Within 2 hours |
None |
Within 5 days |
None |
Within 28 days |
Gully/catchpit (drain) silt level |
Causing flooding to the highway or third party property |
Within 2 hours |
None |
Within 5 days |
None |
Within 28 days |
Cover damage / iron work |
A missing inspection chamber cover, gully or grating or other ironwork anywhere within the highway. |
Within 2 hours |
Cover/grating broken |
Within 5 days |
Rocking/rattling or excessive polishing |
Within 28 days |
Cover level differences |
Carriageway: Raised or lowered by greater than or equal to 100mm. Footway/Cycleway: Cover raised or lowered by greater than or equal to 40mm. |
Within 2 hours |
Carriageway: Raised or lowered by greater than or equal to 60mm and less than 100mm. Footway/Cycleway: Cover raised or lowered by greater than or equal to 30mm and less than 40mm. |
Within 5 days |
Carriageway: Raised or lowered by greater than or equal to 40mm and less than 60mm deep and at least 300mm Footway/Cycleway: Cover raised or lowered by greater than or equal to 20mm and less than 30mm. |
Within 28 days |