Carriageway
Please note: at formalised pedestrian crossing points footway interventions shall be used.
Area | Requirement | Repair timescales |
---|---|---|
Anti skid | Excessive wear in running lane(s) at all safety locations on the carriageway at approaches to controlled crossings or junctions. | Within 2 hours |
None | Within 5 days | |
None | Within 28 days | |
Pothole | Greater than or equal to 100mm deep and at least 300mm wide in all directions | Within 2 hours |
Greater than or equal to 60mm deep and at least 300mm wide in all directions | Within 5 days | |
Greater than or equal to 40mm deep and at least 300mm wide in all directions | Within 28 days | |
Joints or cracks – parallel to road | Greater than or equal to 50mm width and at least 40mm deep. | Within 2 hours |
Greater than or equal to 35mm width and at least 40mm deep. | Within 5 days | |
Greater than or equal to 25mm width and at least 40mm deep. | Within 28 days | |
Joints or cracks – horizontal to road | None | Within 2 hours |
Greater than or equal to 50mm width and at least 40mm deep. | Within 5 days | |
Greater than or equal to 25mm width and at least 40mm deep. | Within 28 days | |
Heave and rutting (Rapid change in surface creating hump or depression) | None | Within 2 hours |
Heave or rutting greater than or equal to 100mm vertically in a maximum length of 600mm | Within 5 days | |
Heave or rutting greater than or equal to 50mm vertically in a maximum length of 600mm | Within 28 days | |
Fatting (Bitumen excess at road surface) | Fatting has occurred or occurring | Within 2 hours |
None | Within 5 days | |
None | Within 28 days | |
Cattle Grid | Cattle grid raised or sunken by greater than or equal to 100mm | Within 2 hours |
Cattle grid raised or sunken by greater than or equal to 60mm | Within 5 days | |
Cattle grid raised or sunken by greater than or equal to 40mm | Within 28 days | |
Blockwork raised table (Raised paving) | Missing block(s) | Within 2 hours |
Rocking paving blocks across 50% and ramps showing signs of rutting/deformation | Within 5 days | |
Rocking paving blocks across 20% and ramps showing signs of rutting/deformation | Within 28 days | |
Rubber bolt-down speed cushion | Missing section/exposed bolts | Within 2 hours |
Loose bolts | Within 5 days | |
None | Within 28 days |