Intervention levels

Footway

AreaRequirementTimescales
PotholeGreater than or equal to 40mm deep and at least 200mm wide in all directionsWithin 2 hours
PotholeGreater than or equal to 30mm deep and at least 200mm wide in all directionsWithin 5 days
PotholeGreater than or equal to 20mm deep and at least 200mm wide in all directionsWithin 28 days
Trip hazardGreater than or equal to 40mm deepWithin 2 hours
Trip hazardGreater than or equal to 30mm deepWithin 5 days
Trip hazardGreater than or equal to 20mm deepWithin 28 days
Cracks or jointsGreater than 40mm depth, width greater than 25mm Within 2 hours
Cracks or jointsGreater than 30mm depth, width greater than 25mm Within 5 days
Cracks or jointsGreater than 20mm depth, width greater than 25mm Within 28 days