Intervention levels

Cycleway

Area Requirement Timescales
Pothole Greater than or equal to 40mm deep and at least 200mm wide in all directions Within 2 hours
Greater than or equal to 30mm deep and at least 200mm wide in all directions Within 5 days
Greater than or equal to 20mm deep and at least 200mm wide in all directions Within 28 days
Joints or cracks – parallel to cycleway Greater than or equal to 40mm width and greater than 40mm deep. Within 2 hours
Greater than or equal to 30mm width and greater than 40mm deep. Within 5 days
Greater than or equal to 20mm width and greater than 40mm deep. Within 28 days
Uneven surface Difference in level greater than or equal to 40mm and at least 200mm in any direction Within 2 hours
Difference in level greater than or equal to 30mm and at least 200mm in any direction Within 5 days
Difference in level greater than or equal to 20mm and at least 200mm in any direction Within 28 days