Pothole |
Greater than or equal to 40mm deep and at least 200mm wide in all directions |
Within 2 hours |
Greater than or equal to 30mm deep and at least 200mm wide in all directions |
Within 5 days |
Greater than or equal to 20mm deep and at least 200mm wide in all directions |
Within 28 days |
Joints or cracks – parallel to cycleway |
Greater than or equal to 40mm width and greater than 40mm deep. |
Within 2 hours |
Greater than or equal to 30mm width and greater than 40mm deep. |
Within 5 days |
Greater than or equal to 20mm width and greater than 40mm deep. |
Within 28 days |
Uneven surface |
Difference in level greater than or equal to 40mm and at least 200mm in any direction |
Within 2 hours |
Difference in level greater than or equal to 30mm and at least 200mm in any direction |
Within 5 days |
Difference in level greater than or equal to 20mm and at least 200mm in any direction |
Within 28 days |