Planned Maintenance Programme 2025-26

The below shows current scheduled dates for planned maintenance in the 2025-26 financial year.

Please note that this programme is subject to change at short notice as these activities are weather dependent. 
Local residents and businesses affected by these works will be notified closer to works commencing.

Table Macro

Name Town Type of Work Road Number Date
Alfriston Traffic Calming Alfriston     02/06/2025
Hammer Hill Ashburnham Surface Dressing Work C18 Jul 2025
Church Lane (Barcombe Bridge) Barcombe Structures Work C659 Nov 2025
Crazy Lane Battle Structures Work C22 24/02/2025
High Street Battle Rectify SCRIM Failures A2100 Aug 2025
High Street Battle Patching Works A2100 Completed
High Street Battle Patching Works A2100 Completed
High Street Battle Patching Works A2100 Completed
High Street Battle Patching Works A2100 Completed
High Street Battle Patching Works A2100 Completed
Battle Hill Ped Crossing Battle     Nov 2025
Telham Lane Battle Drainage Works U6953 09/06/2025
Market Road Battle     Completed
London Road Battle Drainage Works A2100 27/05/2025
Main Street Beckley Surface Dressing Work B2088 Jul 2025
Main Street Beckley Drainage Works B2088 11/06/2025
London Road Bexhill Rectify SCRIM Failures A269 Aug 2025
Buckhurst Road Bexhill Drainage Works   Nov 2025
The Gorses Bexhill Surface Dressing Work U6543 Jul 2025
The Barnhams Bexhill Surface Dressing Work U6537 Jul 2025
Hastings Road Bexhill Rectify SCRIM Failures A2036 Jan 2026
Holliers Hill Bexhill     Nov 2025
London Road Bexhill     Nov 2025
Wrestwood Road Bexhill     Nov 2025
Collington Avenue Bexhill     Mar 2026
Bexhill Mini Roundabouts Bexhill     Completed
King Offa Crossing Bexhill     Dec 2025
All Saints Lane Bexhill     Completed
All Saints Lane Bexhill     Completed
All Saints Lane Bexhill     Completed
Collington Lane (East) Bexhill Drainage Works U6531 Jul 2025
School Place Bexhill Footway Work   Completed
High Street Blackboys Surface Dressing Work B2192 Jun 2025
Tickerage Lane Blackboys     Completed
Lewes Road Blackboys   B2192 Completed
Cackle Street Brede Patching Works A28 Completed
Brede Hill Brede Patching Works A28 Jul 2025
Cackle Street Brede Surface Dressing Work A28 Jul 2025
Udimore Road Brede   B2089 05/06/2025
Battle Road Brightling Rectify SCRIM Failures B2096 Aug 2025
Rectory Hill Brightling Rectify SCRIM Failures C18 Aug 2025
Cackle Street Brightling Drainage Works C280 Completed
Heathfield Road Burwash Patching Works A265 Completed
High Street Burwash Patching Works A265 Completed
Vicarage Lane Burwash Patching Works U6905 12/05/2025
Shrub Lane Burwash     Completed
Heathfield Road Burwash Common Patching Works A265 Aug 2025
Framfield Road Culvert Buxted Structures Work   Apr 2026
Uckfield Road Buxted Rectify SCRIM Failures A26 Jan 2026
Kitchenham Road Catsfield Crack and Jointing Work A271 27/05/2025
Kitchenham Road Catsfield Surface Dressing Work A271 Jul 2025
Kilnwood Lane Chailey Drainage Works A275 Completed
Kilnwood Lane Chailey Drainage Works A275 12/05/2025
Golden Cross Chiddingly Rectify SCRIM Failures A22 Jan 2026
Whitesmith Chiddingly Rectify SCRIM Failures A22 Mar 2026
Chandlers Mead Cooksbridge Surface Dressing Work U5068 Jun 2025
High Street Cross In Hand   B2192 Completed
Fermor Road Crowborough Footway Work U7157 Aug 2025
Forest Dene Crowborough Footway Work U7152 Aug 2025
Goldsmiths Avenue Crowborough Footway Work U7792 Aug 2025
Herne Down Crowborough Footway Work U7157 Aug 2025
Manor Way Crowborough Footway Work U7803 Sep 2025
Herne Road Crowborough Footway Work U7160 Sep 2025
Melfort Road Crowborough Footway Work U7797 Sep 2025
Sandridge Crowborough Footway Work U7804 Sep 2025
Church Hill Crowborough Surface Dressing Work B2188 Jun 2025
Crowborough Hill Crowborough     Completed
Goldsmith Avenue Crowborough Drainage Works U7792 19/05/2025
Kings Chase Crowborough     Completed
Croft Road Crowborough Drainage Works C11 Completed
Palesgate Lane Crowborough Structures Work U7857 Completed
Palesgate Lane Crowborough Structures Work U7857 Completed
Palesgate Lane Crowborough Structures Work U7857 Completed
Crowborough Hill Crowborough Drainage Works B2100 Jul 2025
Crowhurst Road Crowhurst Structures Work C93 Nov 2025
A275 Danehill Patching Works A275 15/05/2025
A275 Danehill   A275 12/05/2025
Beacon Road Ditchling Surface Dressing Work C203 Jun 2025
Common Lane Ditchling Rectify SCRIM Failures B2112 Dec 2025
High Road Duddleswell Rectify SCRIM Failures B2026 Aug 2025
Chapel Lane East Chiltington Surface Dressing Work U5001 Jun 2025
Novington Lane (South Road) East Chiltington   C6 27/05/2025
Honeypot Lane East Chiltington   C323 27/05/2025
Eastbourne Road East Hoathly Rectify SCRIM Failures A22 Aug 2025
The Quadrangle, Ailies Lane East Hoathly Patching Works U7676 Completed
Walfron Road (Waldron Road) East Hoathly Footway Work C13 Completed
Walfron Road (Waldron Road) East Hoathly Footway Work C13 Completed
Royal Parade (Channel View) [Str. 6428] Eastbourne Structures Work U2180 Aug 2025
Shinewater Viaduct Eastbourne Structures Work A22 Apr 2026
Langley Rise Footbridge Eastbourne Structures Work B2104 Sep 2025
Cross Levels Bridge Eastbourne Structures Work A2280 Apr 2026
Victoria Drive Eastbourne Rectify SCRIM Failures   02/06/2025
Victoria Drive Eastbourne Rectify SCRIM Failures   02/06/2025
Victoria Drive Eastbourne Rectify SCRIM Failures   04/06/2025
South Street Eastbourne Rectify SCRIM Failures A259 09/06/2025
South Street Eastbourne Rectify SCRIM Failures A259 10/06/2025
South Street Eastbourne Rectify SCRIM Failures A259 11/06/2025
Warren Hill Road Eastbourne Surface Dressing Work B2103 Jul 2025
Meads Brow Eastbourne Surface Dressing Work U2003 Jul 2025
Enys Road Eastbourne Surface Dressing Work U2120 Jul 2025
Firle Road Eastbourne Surface Dressing Work U2155 Jul 2025
Boston Close Eastbourne Surface Dressing Work U2294 Jul 2025
Langney Rise Eastbourne Surface Dressing Work B2104 Jul 2025
Kingfisher Drive Eastbourne Surface Dressing Work U2220 Jul 2025
South Street (Y41143) Eastbourne Traffic Signal Works A259 Jul 2025
St Anthony's Avenue (Y41153) Eastbourne Traffic Signal Works A259 Sep 2025
Rodmill Drive Eastbourne Patching Works U2103 28/05/2025
East Dean Road Eastbourne Patching Works A259 21/05/2025
Grove Road Eastbourne     27/02/2025
Devonshire Place Eastbourne     03/03/2025
Seaside Road Eastbourne     05/03/2025
Trinity Place Road Eastbourne     19/03/2025
Towner Gallery Eastbourne     21/03/2025
Cornfield Road   Eastbourne     24/03/2025
Potters Lane Eastbourne     Completed
The Course Eastbourne     Completed
Cleve Road Eastbourne     Completed
Redford Close Eastbourne     Completed
Chailey Close Eastbourne     Completed
Potters Lane Eastbourne     Completed
The Course Eastbourne     Completed
Cleve Road Eastbourne     Completed
Chailey Close Eastbourne     Completed
Greata Cliffe Road Eastbourne     Completed
Marsden Road Eastbourne     Completed
Redford Close Eastbourne     07/04/2025
Chailey Close Eastbourne     07/04/2025
Redford Close Eastbourne     07/04/2025
Spring Lodge Close Eastbourne     07/04/2025
Priory Road Eastbourne     07/04/2025
Priory Road Eastbourne     07/04/2025
Eastbourne Town Centre 2b Eastbourne     14/04/2025
Arlington Road Eastbourne Footway Work U2036 Completed
Etchingham Road Eastbourne Footway Work   Completed
Dittons Road/Saffrons Road Eastbourne Footway Work   Completed
Greenfield Methodist Church Green Street, Eastbourne Eastbourne Footway Work   Completed
Burton Road, Parker Close Eastbourne Footway Work   Completed
Hazelwood Avenue Eastbourne     Completed
Wells Close Eastbourne     Completed
Jerome Close Eastbourne     Completed
Willingdon Park Drive Eastbourne     Completed
Park Avenue Eastbourne   U2257 Completed
Pevensey Road Eastbourne   U2144 Completed
Bourne Street Eastbourne   U2257 Completed
Bourne Street Eastbourne   U2257 Completed
Fairview Lane Eridge Surface Dressing Work U7842 Jun 2025
Eridge Road Eridge Surface Dressing Work A26 Jun 2025
Spratts Brook Eridge Structures Work A26 Aug 2025
Village Street Ewhurst Surface Dressing Work C20 Jul 2025
Exceat Bridge Exceat Structures Work A259 Dec 2026
Eastbourne Road Exceat Rectify SCRIM Failures   Jun 2025
Eastbourne Road Exceat Rectify SCRIM Failures   Jun 2025
Eastbourne Road Exceat Rectify SCRIM Failures A259 Jan 2026
Wick Street Firle Drainage Works U5000 Aug 2025
Daleham Lane Fletching Structures Work   Aug 2025
Church Street Fletching Drainage Works C206 Completed
Church Street Fletching Drainage Works C206 Aug 2025
High Street Flimwell   B2087 28/05/2025
Hartfield Road Forest Row Rectify SCRIM Failures B2110 Sep 2025
Hartfield Road Forest Row Surface Dressing Work B2110 Jun 2025
High Street (Y71133) Forest Row Traffic Signal Works A22 Oct 2025
Kidbrooke Rise Forest Row     Completed
Hammonds Green Framfield Rectify SCRIM Failures B2102 Jan 2026
Lewes Road Framfield   B2192 Completed
Bayham Road (Bells Yew) Frant Drainage Works B2169 12/05/2025
Eridge Rd Frant Rectify SCRIM Failures A26 Sep 2025
Mayfield Road Frant Patching Works A267 Aug 2025
Frant Road Frant Patching Works A267 Aug 2025
Bunny Lane Frant Surface Dressing Work C70 Jun 2025
Furnace Lane Frant Drainage Works B2169 Jul 2025
Benham Mill Lane Frant     Completed
Station Road [Str. 1323] Glynde Structures Work C113 Jul 2025
Bishops Walk Glynde Surface Dressing Work C113 Jun 2025
Whitesmith Golden Cross Surfacing Work A22 Completed
Cherry Gardens Hill Groombridge Surface Dressing Work B2188 Jun 2025
Station Road Groombridge Patching Works C70 Completed
Cherry Gardens Hill Groombridge Drainage Works B2188 Completed
Cherry Gardens Hill Groombridge Drainage Works B2188 Completed
Cherry Gardens Hill Groombridge Drainage Works B2188 Completed
Cherry Gardens Hill Groombridge Drainage Works B2188 Completed
Butchers Lane [Str. 315] Guestling Structures Work C22 Jul 2025
Friars Hill Guestling     Completed
Five Chimneys Hadlow Down Surface Dressing Work C270 Jun 2025
Hastingsford Lane Hadlow Down Surface Dressing Work C11 Jun 2025
Ersham Road (Y71193) Hailsham Traffic Signal Works   Sep 2025
Ersham Road Hailsham   B2104 Completed
Eastbourne Road Halland Surfacing Work A22 15/05/2025
Lewes Road Halland   B2192 Completed
B2192 Halland   B2192 Completed
B2192 Halland   B2192 25/04/2025
B2192 Halland   B2192 28/04/2025
B2192 Halland   B2192 01/05/2025
B2192 Halland   B2192 08/05/2025
B2192 Halland   B2192 08/05/2025
B2192 Halland   B2192 13/05/2025
B2192 Halland   B2192 21/05/2025
B2192 Halland   B2192 03/06/2025
B2192 Halland   B2192 04/06/2025
B2192 Halland   B2192 05/06/2025
B2192 Halland   B2192 05/06/2025
Heathfield Road Halland   B2192 Completed
Holtye Road Hammerwood     Completed
Harts Lane (Black Bridge) [Str. 2416] Hartfield Structures Work U7845 02/06/2025
Edenbridge Road Hartfield Rectify SCRIM Failures   Completed
Colestock Rd Hartfield Rectify SCRIM Failures A264 Sep 2025
Edenbridge Road Hartfield   B2096 06/06/2025
Filsham Road Hastings Structures Work C238 May 2026
West Marina Footbridge Hastings Structures Work U3100 Jul 2025
Buttons Lane [Str. 2407] Hastings Structures Work U7546 Jul 2025
Wellington Road [Str. 0092] Hastings Structures Work U3197 Sep 2025
Station Approach / Havelock Road Hastings Traffic Signal Works A21 19/05/2025
Bulverhythe Road Washout Hastings Structures Work C82 Aug 2025
St Helens Road slip A2100 Hastings Structures Work A2100 Feb 2026
White Rock Hastings Rectify SCRIM Failures A259 Completed
White Rock Hastings Rectify SCRIM Failures A259 Completed
White Rock Hastings Rectify SCRIM Failures A259 Completed
Albert Road Hastings Rectify SCRIM Failures A2101 Aug 2025
Battle Road Hastings Rectify SCRIM Failures B2159 Aug 2025
London Road Hastings Rectify SCRIM Failures A2102 Sep 2025
Seddlescombe Road North Hastings Rectify SCRIM Failures A21 Sep 2025
Sedlescombe Road Hastings Patching Works A21 Aug 2025
Parkstone Road Hastings Surface Dressing Work U3029 Jul 2025
Albert Road Hastings Rectify SCRIM Failures A2101 Dec 2025
Bexhill Road Hastings Rectify SCRIM Failures A259 Dec 2025
Grand Parade (Marina) Hastings Rectify SCRIM Failures A259 Jan 2026
Sedlescombe Road North Hastings Rectify SCRIM Failures A21 Jan 2026
White Rock Hastings Rectify SCRIM Failures A259 Feb 2026
Little Ridge Avenue Hastings Patching Works U3012 Completed
Station Approach Hastings     Sep 2025
Albert Road Hastings     20/01/2025
Filsham Road Bus Priority Phase 3 Hastings     Jan 2027
The Ridge Bus Stops Ph2 Hastings     Sep 2025
Queensway Gateway Road Hastings   A2100 06/06/2024
Church Wood Drive Hastings Footway Work U3050 Completed
Carpenter Drive Hastings Footway Work   Completed
Castle Hill Hastings Footway Work   Completed
Kent Road/Northampton Road Hastings Footway Work   28/04/2025
Harkness Drive Hastings     Completed
Hill Street Hastings     Completed
Firle Close Hastings     Completed
Barley Lane Hastings     Completed
East Beach Street Hastings   A259 Completed
Sedlescombe Road North Hastings   A21 Completed
Sedlescombe Road North Hastings   A21 01/05/2025
Cambridge Road Hastings   A21 Completed
Cambridge Road Hastings   A21 Completed
Cambridge Road Hastings   A21 Completed
Cambridge Road Hastings   A21 Completed
School Lane (Greenacres) Heathfield Drainage Works C406 06/05/2025
Burwash Rd Heathfield Patching Works A265 Jun 2025
Vines Corner (Y71231) Heathfield Traffic Signal Works A265 Jan 2026
Battle Road Heathfield Patching Works B2096 Oct 2025
Upper Station Road Heathfield     Completed
Cross In Hand Road Heathfield Drainage Works A265/7 Jun 2025
Little London Road Heathfield   A265/A267 Completed
Little London Road Heathfield   A265/A267 30/04/2025
Lewes Road Heathfield   B2192 Completed
Uckfield Road Herons Ghyll Surface Dressing Work A26 Jun 2025
Trolliloes Lane Herstmonceux Surface Dressing Work U7071 Jul 2025
A264 Holtye   A264 Completed
A264 Holtye   A264 Completed
Horsewalk Hooe Structures Work U7108 Oct 2025
Hillside Drive Horam Surface Dressing Work U7345 Jul 2025
Chiddingly Road Horam Drainage Works C114 Jul 2025
Horns Hill Hurst Green Surface Dressing Work A229 Jul 2025
Station Road Hurst Green Footway Work   Completed
Ticehurst Road Hurst Green Drainage Works B2099 Oct 2025
Iden Bridge Iden Structures Work B2082 May 2026
Iden Lock Iden Structures Work C296 Jul 2026
Newhaven Road Iford Rectify SCRIM Failures C7 Jan 2026
Rose Hill Isfield Surface Dressing Work A26 Jun 2025
Jevington Road Jevington Surface Dressing Work C40 Jul 2025
Lewes Road Laughton Rectify SCRIM Failures B2124 Sep 2025
Malling Hill Ret Wall [Str. 51] Lewes Structures Work A26 Jun 2025
Offham Steps Lewes Structures Work A2029 Aug 2025
Brighton Rd (Prison Cross Road) Lewes Traffic Signal Works A277 17/03/2025
Nevill Road Lewes Rectify SCRIM Failures A275 Aug 2025
Malling Street Lewes Patching Works A26 Jun 2025
Church Street Garages Lewes Structures Work U5127 Oct 2025
Mayhew Road (Malling Bridge [Str. 1425]) Lewes Structures Work   Sep 2025
Malling Street Lewes Surface Dressing Work A26 Jun 2025
Brooks Road Culvert Lewes Structures Work   Sep 2025
Friars Walk Lewes Surfacing Work B2193 Completed
Church Lane Lewes     Completed
Southover Road Lewes Footway Work U5122 Completed
Southover Road Lewes Footway Work U5122 Completed
Church Lane Lewes Structures Work U5127 Completed
Church Lane Lewes Structures Work U5127 Completed
Church Lane Lewes Structures Work U5127 Completed
Little Horsted Roundabout Little Horsted Surfacing Work A259 Sep 2025
Lewes Road Little Horsted Surface Dressing Work A26 Jun 2025
Lower Horsebridge Lower Horsebridge Patching Works A271 Oct 2025
A271 Lower Horsebridge Drainage Works A271 Completed
GateHouse Bridge (Underhill) Maresfield Structures Work U7500 19/05/2025
High Rd Maresfield Rectify SCRIM Failures B2026 Aug 2025
Duddleswell Rd Maresfield Rectify SCRIM Failures B2026 Aug 2025
Maresfield Road Maresfield Structures Work   Aug 2025
Wadhurst Road Mark Cross Drainage Works B2112 Completed
Catts Hill Mark Cross Patching Works B2100 Aug 2025
Tunbridge Wells Road Mark Cross Patching Works A267 Aug 2025
High Street Mayfield Footway Work C14 Completed
Fir Toll Close Mayfield     Completed
Brighton Road Newhaven Rectify SCRIM Failures A259 Dec 2025
Newhaven Town Signs Newhaven     Completed
Port Access Road (Vegetation) Newhaven     Jul 2025
St Martins Crescent Newhaven Footway Work   Completed
Gold Bridge Newick Structures Work A272 May 2026
St Marys church Newick Footway Work   Completed
Oldaker Road Newick     Completed
Standard Hill Ninfield Surface Dressing Work A269 Jul 2025
Stocks Meadow Ninfield     Completed
Lower Street Ninfield     Completed
Lower Street Ninfield     Completed
Stocks Meadow Ninfield     Completed
Hastings Road Northiam Patching Works A28 Aug 2025
Rocks Hill Northiam Surface Dressing Work U6995 Jul 2025
The Street Offham Rectify SCRIM Failures A275 Aug 2025
South Coast Road Peacehaven Patching Works A259 Oct 2025
Greenwich Way (Y51323) Peacehaven Traffic Signal Works U5862 Nov 2025
Barnets Hill Peasmarsh Patching Works A268 Jul 2025
Batts Bridge Road Piltdown Drainage Works A272 Sep 2025
Rye Road Playden Patching Works A268 Jul 2025
Station Road Plumpton     Completed
Half Mile Drove Ringmer Surface Dressing Work   Jun 2025
Ringmer Road Ringmer Surface Dressing Work B2192 Jul 2025
Uckfield Road Ringmer Rectify SCRIM Failures A26 Jan 2026
Hawkhurst Road Robertsbridge Surface Dressing Work B2244 Jul 2025
Brightling Road Robertsbridge Drainage Works C18 Completed
Ludpit Lane Robertsbridge Drainage Works C213 Completed
Ludpit Lane Robertsbridge Drainage Works C213 04/06/2025
Station Road Robertsbridge Footway Work   Completed
Bishops Lane Robertsbridge     Completed
Battle Road Rushlake Green Drainage Works B2096 Oct 2025
Military Road Rye Rectify SCRIM Failures C296 Aug 2025
Rye Hill Rye Patching Works A268 Jul 2025
Harbour Road Rye Surface Dressing Work C98 Jul 2025
Traders Passage Rye Structures Work   Jan 2026
Station Approach Rye Footway Work   Completed
St Crispians Seaford Structures Work   Completed
Sutton Road Seaford Rectify SCRIM Failures A259 Sep 2025
Marine Parade Wave Wall Seaford Structures Work U5484 Aug 2025
Hawth Hill Seaford Surfacing Work U5482 Aug 2025
Churchill Road Seaford Surface Dressing Work U5488 Jun 2025
Clementine Avenue Seaford Surface Dressing Work U5488 Jun 2025
Chyngton Gardens Seaford Surface Dressing Work U5411 Jun 2025
Chyngton Road Seaford Surface Dressing Work U5457 Jun 2025
Chyngton Way Seaford Surface Dressing Work U5465 Jun 2025
Buckle Bypass Seaford Rectify SCRIM Failures A259 Dec 2025
Eastbourne Road Seaford Rectify SCRIM Failures A259 Jan 2026
Sutton Avenue Seaford     Aug 2025
Seaford Tree Restoration Seaford     Completed
St Crispans Seaford Footway Work   20/05/2025
Links Close Seaford Footway Work   Completed
Guardswell Place Seaford Footway Work   15/05/2025
Compasses Sedlescombe Rectify SCRIM Failures B2244 Aug 2025
Bexhill Road / Harley Shute St Leonards Traffic Signal Works A259 06/05/2025
London Road St Leonards Surfacing Work A2102 Oct 2025
The Ridge West St Leonards Patching Works A2100 Aug 2025
Dymond Road St Leonards Drainage Works U3064 Completed
Warren Close St Leonards     Completed
Footpath from Cooden Ledge to Fairfax Avenue St Leonards     Completed
Junction Road Staplecross Drainage Works B2244 Sep 2025
Cottenden Road Stonegate Patching Works C83 Jun 2025
Bardown Road Stonegate   C214 Completed
Ticehurst Road Ticehurst Structures Work B2099 Completed
B2099 Ticehurst Drainage Works B2099 Completed
Ridgewood [Str. 2145] Uckfield Structures Work C58 Jun 2025
Rocks Park Road Uckfield Surface Dressing Work U7776 Jun 2025
Keld Drive Uckfield Surface Dressing Work U7515 Jun 2025
Uckfield Bus Station Uckfield     Completed
Uckfield Bus Station Uckfield     Completed
2 Senlac Green Uckfield Footway Work   Completed
Nursey Lane Uckfield Footway Work U7779 Completed
Nursey Lane Uckfield Footway Work U7779 Completed
Lashbrooks Road Uckfield Footway Work U7776 Completed
Lashbrooks Road Uckfield Footway Work U7776 Completed
Lashbrooks Road Uckfield Footway Work U7776 Completed
Lashbrooks Road Uckfield Footway Work U7776 Completed
Udimore Road Udimore Rectify SCRIM Failures B2089 Dec 2025
Udimore Road Udimore Rectify SCRIM Failures B2089 Jan 2026
Safety Barriers (YR3) Various Structures Work   Dec 2025
Column Replacement - Batch 12 Various Traffic Signal Works   09/06/2025
Column Replacement - Batch 13 Various Traffic Signal Works   Aug 2025
Street Lighting Works - Batch 11 Various Traffic Signal Works - 01/04/2025
England Coast Path establishment works - Eastbourne to Camber Various Footway Work   Completed
Station Road Wadhurst Drainage Works U6536 Aug 2025
Moseham Hill Wadhurst Patching Works B2099 Jul 2025
Snape Lane Wadhurst Drainage Works U7547 12/05/2025
Durgates Industrial Estate Wadhurst     Completed
Sparrows Green Road Wadhurst Drainage Works B2100 Jul 2025
Wartling Road Wartling Rectify SCRIM Failures C17 Dec 2025
Blumens Lane Culvert Westfield Structures Work U6955 Completed
Blumens Lane Culvert Westfield Structures Work U6955 Nov 2025
Brede Road Westfield Patching Works A28 Jul 2025
Parsonage Lane Westfield Drainage Works U6629 Aug 2025
Main Road Westfield Drainage Works A28 Completed
Bluemans Lane Westfield Patching Works U6955 Completed
Stonestile Lane, Hastings Westfield Patching Works C414 Completed
Lewes Road Westmeston     Completed
Church Street (Y71283) Willingdon Traffic Signal Works A2270 Oct 2025
The Street Wilmington Surface Dressing Work C210 Jul 2025
Monks Walk Winchelsea Surface Dressing Work C298 Jul 2025
Wickham Rock Lane Winchelsea Drainage Works U6418 Completed
Green Road Wivelsfield Drainage Works C6 Jul 2025
Slugwash Lane Wivelsfield Drainage Works U5992 Jul 2025